February 2019

  • Scaffold is down and the building is looking fantastic
  • We are on the home stretch now

January 2019

HAPPY NEW YEAR

  • Progress has continued this year, with everyone coming back fresh from the well deserved Xmas break
  • Internal fit-out continues at a steady pace, with joinery up to the second last floor and tiling there too.
  • The finishing trades are moving at a good pace, with the external scaffolding starting to come down. Only a sneak peak this month at what the building looks like!
  • Stay tuned, as next months update will reveal the outside of the building

December 2018

MERRY XMAS

  • December has seen great progress to the project.
  • The internal fit-out well underway
  • External works are nearing completion, with scaffold coming down in January

November 2018

  • This month has progressed great, with joinery and tiling working it’s way up the building.
  • The roof structure is almost complete and next month will see the scaffolding starting to come down
  • Stay tuned

31st October 2018

? HAPPY HALLOWEEN ?

  • We can all agree, the year is absolutely flying, November already!
  • The project is going well, the roof slab is poured and we are well into the internal fit-out stage
  • Tilers started on site this week on level 1
  • Plasterers are framing on level 4 and sheeting on level 3
  • Cabinetry starts tomorrow
  • We are still aiming for Mid-Feb completion

30th September 2018

  • Another great month for progress on site, with level 5 slab poured. Only the roof to go!!
  • The wall framing has commenced on level 1 and the internal fit-out works are well underway

31st August 2018

  • The Structure continues to grow this month, with level 4 formwork visible in the pictures

July 30 2018

  • Structure is growing, with major transfer slabs finished.
  • Images show preparation for level 2 suspended slab to be poured tomorrow
  • Lower ground formwork is starting to be stripped, so we will see the start of internal fit-out in the next month

June 26 2018

June 2018

  • This month, we are on the Upper ground floor, with block work commencing on the rear apartments
  • Great work by the site guys!

30th May 2018

  • We are well underway with the structure, as you can see the lower ground floor slab has been poured.
  • Great progress this month!